January 2026

Angular framework of aluminum beams, painted white, installed in ceiling of store.
Projects

Frame Structure for WTC Event

This is the frame structure that we just sent out for an event at the World Trade Center. I got a concept drawing with dimensions and was told it had to break down to fit in an elevator then reassemble over people’s heads with no visible fasteners.

Rectangular aluminum tubing welded into a frame that makes up one hull of a catamaran, sitting on floor of weld shop.
Boats, Projects

Commercial Catamaran

Here is a project that we started a little while ago and it kind of stalled out due to changes and Coast Guard approvals but we recently started back on it so I will catch everyone up over a few posts. Beginnings of a boat. Commercial catamaran going to Miami. 76 feet long.

Aluminum soft top frame on fishing boat supported by wood frame, view from front of boat.
Boats, Projects

Soft Top Frame

Two levels, upper section 13 feet wide and 19 feet long lower section 13 feet wide and 12 feet long. Both sections have to come apart and split down the middle to fit in the powder coat oven.

Scroll to Top